On 17.10.2012 SUN WIND completed the construction of its new photovoltaic park with a power of 149.76 kWp in the location “GIOLIA D.D.GALATA” of the municipality of Halkia, of the Prefecture of Etoloakarnania, a jewel for the prefecture of ownership A. SAKARIDIS & CO OE II. With a very high quality construction,, since American panels of top quality were used with a 12-year warranty of mechanical parts and 30 years of performance of the state-of-the-art and fully automated factory of AMERISOLAR, Italian inverter equipment and German cable equipment, while the panels used, the control panel and the wiring were also heated, as well as a technical inspection of the rest of the equipment upon receipt, for the correct performance of the park to our customer, with preventive inspection of all equipment, in addition to the quality of construction of the park. All the above are part of the Integrated technically certified works that our company applies in each of its projects.