preloader
Επικοινωνία
Tel: (+30) 2310 543 805,
Fax: (+30) 2310 501 804
Email: [email protected]
Διεύθυνση
ΓΙΑΝΝΙΤΣΩΝ 31,
ΘΕΣΣΑΛΟΝΙΚΗ,
Τ.Κ. 54627

GREENERA ENERGY AGR.60

On 22.06.2012 SUN WIND completed the construction of its new photovoltaic park with a power of 99.75 kWp in the place “POLYPLATANOS” of the Municipality of Florina, the Prefecture of Florina, a jewel for the prefecture owned by GREENERA ENERGY top quality with 12 years warranty for mechanical parts and 25 years performance of the state-of-the-art and fully automated TRINA factory and production and German equipment of inverters and cables, while the panels used were used, the control panel and the wiring, as well as technical inspection of the rest of the equipment upon receipt, for the correct performance of the park to our customer, with preventive inspection of all equipment , in addition to the quality of construction of the park. All the above are part of the Integrated technically certified works that our company applies in each of its projects.

  • Client

    GREENERA ENERGY AGR.60